Owner: NYS Dept. of Transportation
Approx. Revenue: $21,400,000.00
This project involves seven full bridge replacements over water which will include design & construction inspection by the Design Build Team. Work includes control of stream flows, demolition of the existing structures, and complete construction of the replacement bridges. Structures include composite steel superstructures, precast concrete arch culverts, precast concrete 3-sided span units, and precast concrete box beams. Highway work for the full replacement bridges will include approach work to tie into the new structures.