ASCE Award: 1-81/287 Replacement of the Scotland Hill Road and College Road Bridges

Antonio Narciso and Tim Altman from ASIABCC (Antonio on far left and Tim standing to his left) were present to receive the award.

Project Highlights: The New York State Thruway Authority retained M.G. Mclaren Engineering and Land Surveying, P.C. to provide bridge, highway, and drainage design along with surveying services for the Replacement of the Scotland Hill Road and College Road Bridges. The original structures, built in the 1950s, were at the end of their service life and were replaced with new structures which include numerous upgrades to enhance safety for motorists and pedestrians.

A major component of the project was enhancing the bridge’s safety measures which included increasing the vertical clearance of the bridges to an industry standard of 16’6″, a 34′ roadway width with wider shoulders and approaches, and new sign structures.

A. Servidone, lnc./B. Anthony Construction Group JV, of Castleton, NY, was the contractor for the construction of the bridges. The project was completed on time and within budget.

Careers

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

PROJECTS

Blenheim-Gilboa Pumped Storage Project

Location: Gilboa, NY Owner: NYS Power Authority Approx. Revenue:  $2,800,000.00 Description: Restoration of an earthen berm and rip rap armament that was washed away during Hurricane Irene. The project also included excavation and contouring of the stream channel,...

Rock Cut Slope Remediation, Milestone Square

Location: Pleasant Valley, Dutchess County, New York Owner:  Time Equities, Inc. Approx. Revenue:  $93,830.00 Description:  This rock-cut slope remediation project consisted of clearing and grubbing along the top of the slope and toe of slope, hand scaling of loose...

Buffalo Diverse

Location: Town of Buffalo, New York Owner: Williams Communications Approx. Revenue: $4,650,000.00 Description: Installation of approximately 6 miles of fiber optic cable.  Work includes the installation of conduits, handholes, and manholes, maintenance and removal of...

Rock Mitigation Blenhiem-Gilboa Power Plant

Location: Gilboa, Schoharie County, New York Owner:  NYS Power Authority Approx. Revenue:  $750,000.00 The project includes the removal of loose rock from the existing rock face, installation of approximately 44,000 square feet of rock catchment fencing supported by...

Interstate 84 Over US Route 9W, Bridge Rehabilitation

Location: Newburgh, Orange County, New York Owner: New York State Bridge Authority Contract Amount:  $14,652,659.00 Description: This project includes the rehabilitation of an approximate 170 feet multi span bridge, drainage improvements, concrete median barrier...

NYS Thruway Cashless

Location: New York State Thruway Mile Post 45 to Mile Post 496 Owner: New York State Thruway Approx. Rev: $350,000,000 Description: Design Build Project for the New York State Thruway Authority to convert existing ticketed tolling system to Automatic Electronic...