Heaton’s Pond Improvements

Home » Projects » Flood Control / Dams » Heaton’s Pond Improvements

Owner:  Town of Clarkstown, Dept. of Environmental Control
Approx. Revenue:  $730,000.00

Description:  Dredging of Heaton’s Pond and portions of the stream channel and stockpiling material on-site, stabilization of the stream banks, rehabilitate existing low level slide gate, restoration, and repaving. Construct access drive, Erosion control, Clearing, Temporary cofferdam and bypass pumping of the East Branch Hackensack River, and constructing gabion basket retaining wall.